45′ Boat Slip, Only Two-Finger, Port City Marina





The only 45-foot two-finger slip at Port City Marina, with a pier on both sides for easy docking and access. Priced to sell; the owner is relocating.
Great views of the marina with three onsite restaurants. Concrete floating docks, a concierge pump-out and a wholesale fuel dock. Run your dinghy a few hundred yards out for Live Oak concerts, and dock and dine downtown, which is also walkable along the Riverwalk. Liveaboards allowed, with modern showers and bathrooms onsite at Pier 33. A protected hurricane hole, so you do not have to move or haul out your vessel when storms threaten. Financing available.
What’s included.
- ✓ 45′ Slip with Two Finger Piers
- ✓ Only 45′ Two-Finger Slip at the Marina
- ✓ Easy Docking & Access from Both Sides
- ✓ Excellent Marina Views
- ✓ Three Onsite Restaurants
- ✓ Concrete Floating Docks
- ✓ Concierge Pump-Out & Wholesale Fuel Dock
- ✓ Liveaboards Allowed
- ✓ Modern Showers & Bathrooms at Pier 33
- ✓ Riverwalk Access to Downtown Dining
- ✓ Enjoy Live Oak Pavilion Concerts from the Water
- ✓ Protected Hurricane-Hole Location
- ✓ No Named-Storm Haul-Out or Relocation Required
- ✓ Financing Available

Port City Marina
This slip is located at Port City Marina in Wilmington. Explore the marina’s amenities, location, slip types and what makes it one of the Cape Fear coast’s most desirable home ports.
Explore the marinaFinancing & hurricane protection available
Low-interest financing and protection coverage are negotiated exclusively for Wilmington Boat Slips clients. Ask us how it applies to this slip.
Similar available slips.

60′ Boat Slip, Port City Marina (Estate sale reduced 40K)

Highly desirable 60’ T-Head Slip For Sale, Port City Marina Historic DT Wilmington

